Indorama Ventures Oxide closure project overview
Industrial Demolition Services (IDS) recently completed decommissioning within a live major hazard facility environment, following the Indorama Ventures Ethylene Oxide and Derivatives Plant closure, located within Botany Industrial Park, Sydney.
The facility, previously operated by Huntsman Chemical Company of Australia Pty Ltd (HCCA), was classified as a Major Hazard Facility (MHF). Its proximity to other live MHFs required a meticulous decommissioning program to safely manage hazardous residues while ensuring no disruption to surrounding operations. Effective stakeholder engagement was a critical component of this complex project.
The plant produced ethylene oxide and downstream chemicals, including glycols, glycol ethers, and non-ionic surfactants, supplying industries such as agriculture, mining, cleaning, personal care, and automotive manufacturing. IDS’s scope included the safe removal of redundant process infrastructure, separation of the facility from neighbouring live operations, and management of hazardous waste and residual contamination in compliance with regulatory requirements.
Scope of work
- Managed auction, extraction and transport of process equipment
- Demolition of chemical plants, warehouses, labs, workshops and control rooms
- Removal of overhead gantries, hazardous pipework and large chemical storage tanks
- Demolition of reactors and 40m columns
- Processing of all demolition materials with targeted recycling and reuse
Specialist services required: Decommissioning | Hazardous Materials | Industrial Demolition | Hydro-cutting
Unique challenges
The project demanded extensive planning approvals from local councils, statutory authorities, and business park owners. Close engagement with key stakeholders, including adjacent tenants operating other MHFs, was essential. Works were subject to strict regulatory oversight, with detailed task-based methodologies and risk assessments for handling highly hazardous chemicals such as ethylene oxide.
IDS managed live and shared services, including effluent and stormwater systems, and undertook demolition adjacent to live substations and sensitive transformer switchgear. All works needed to be completed down to slab level without disturbing the underlying concrete, given the site’s contamination history.
Solutions
Leveraging extensive experience in hazardous industrial environments, IDS worked closely with Indorama Ventures to develop safe and efficient methodologies. Joint safety workshops with client management and operations teams ensured a shared understanding of hazards and control measures.
Detailed Inspection and Test Plans (ITPs) were developed, requiring multiple sign-offs from both IDS and the client. All tanks, pipework, pressure vessels, and reactors were individually inspected, gas-tested, and drilled at low points where necessary.
Plant cables were cut by a licensed electrician engaged by IDS, providing an additional safeguard beyond client isolations. Specialist equipment, plant, and PPE (including PAPR with custom filters) were deployed for high-risk tasks. Environmental controls such as stormwater protection, dust suppression, and vibration monitoring were applied throughout. Crash pads were established for induced collapse and toppling methods, while HV specialists and consultants were engaged to make sure demolition did not impact electrical supply to neighbouring facilities.
Outcomes
The Indorama Ventures Oxides closure project was delivered on time and on budget, with no environmental incidents or disruptions to other Botany Industrial Park tenants. IDS successfully demolished more than 50 tanks, 15 reactors, 15 columns, and 200 pressure vessels, in addition to multiple plant buildings.
All structures were safely demolished and removed without ground disturbance, and vibration levels were maintained below 5 mm/s near sensitive structures. The project demonstrates IDS’s capability to safely manage large-scale hazardous decommissioning within a live Major Hazard Facility environment.
Indorama Ventures Oxide closure resource recovery & waste management stats
- 4,200 tonnes of scrap steel (mild and stainless) recovered and recycled
- 250 tonnes of general waste removed
- 1,000 tonnes of concrete and brick cleared
- 80 tonnes of asbestos safely removed