Location: Templestowe, Victoria
    Duration: August – September 2025

    Parks Victoria | environmental demolition | Industrial Demolition Services

    Demolition clean up project overview

    Parks Victoria engaged Industrial Demolition Services (IDS) to deliver a comprehensive demolition clean up as part of an environmental restoration initiative. Redundant structures located in parkland near Kearney Lane, Templestowe, Victoria were identified for removal to support long-term environmental outcomes.

    The scope of the demolition clean up included demolishing two single-storey weatherboard houses constructed from timber and brick on slab and stumps. Associated structures – old foundations, paved areas, fencing, gates, underground water tanks, septic systems – and accumulated debris were also to be removed as part of the demolition clean up, to help restore the site to a ‘natural as possible’ state and support the preservation of local flora and fauna.

    IDS brought proven experience to this project, having successfully completed previous demolition works for Parks Victoria. The environmental clean up helped return the site to a ‘natural as possible’ state, in line with the client’s restoration objectives.

    IDS was selected due to its proven experience delivering demolition projects for Parks Victoria, in line with the client’s environmental and land management objectives.

    Scope of work

    The Parks Victoria demolition clean up requirements included:

    • site establishment and enabling works
    • disconnection and isolation of all services on site
    • salvage of selected items
    • demolition of nominated structures
    • removal of hazardous building materials
    • decommissioning and removal of UG Septic Tanks
    • loadout and recycling and/or disposal of demolition materials
    • final clean up and handover to client

    Specialist services required:  Asset Realisation  |  Demolition  |  Hazardous Waste  |  Recycling

    Unique challenges

    This demolition clean up project presented several distinct challenges that required careful planning and adaptive on-site management.

    A key challenge involved strict environmental protection requirements. IDS was required to minimise ground disturbance and protect surrounding vegetation while mobilising plant and equipment. The natural parkland setting needed to remain unaffected throughout the works.

    Site access constraints were also very challenging. Machinery had to be transported across a narrow, single-lane bridge and along a steep access road unsuitable for standard float trucks. Alternative transport solutions and precise coordination were required to safely mobilise plant and equipment on site.

    The project also presented an unexpected on-site wildlife incident. While removing a retaining wall at House 1, a snake was discovered nesting within the structure. Works were halted until the snake safely retreated to the surrounding bushland. For the remainder of the project snake gaiters were required for all personnel to ensure everyone’s safety.

    These challenges highlighted the importance of environmental awareness, flexible logistics, and strong safety protocols – key elements in successfully delivering demolition clean up projects within sensitive natural environments for Parks Victoria.

    Solutions

    To meet environmental requirements, all IDS personnel completed Parks Victoria environmental awareness training prior to commencing demolition clean up works, to ensure a full understanding of the site’s ecological sensitivities.

    Machinery movements were carefully managed to minimise disturbance, and a thorough demolition site clean up was completed to restore the area to a natural appearance consistent with the client’s expectations.

    To overcome access limitations, IDS secured an OSOM Permit, confirming the approved transport route could safely accommodate a 20-tonne excavator. Trained spotters guided the float up the steep access road and the entry gate was temporarily removed, allowing safe passage of equipment without damage to park infrastructure.

    Following the unexpected discovery of asbestos in House 2, the site supervisor immediately halted works and notified the client. Licensed asbestos removalists and hygienists were mobilised immediately to safely remove and clear the contaminated material, enabling demolition clean up works to resume without compromising safety or compliance.

    Outcome

    The team’s tailored solutions ensured the project progressed smoothly while upholding environmental, safety, and operational standards. The project was delivered efficiently and within the agreed timeframe, meeting Parks Victoria’s requirements for safety, environmental care, and operational compliance.

    A substantial volume of demolition material was responsibly removed and disposed of as part of the demolition clean up, with more than 90% recycled, including:

    • 150+ tonnes of general waste
    • 250+ tonnes of concrete & brick

    Overall, the project successfully achieved its objectives by removing redundant structures, restoring the site’s natural character, protecting both personnel and wildlife and delivering an environmentally responsible outcome for Parks Victoria.